Development of a living wall at the Maison Familiale Rurale de Ventavon Association 'Une pierre sur l'autre'

  • Louis Cagin1
Affiliations
  1. 1 Association 'Une pierre sur l'autre', France

International Terraced Landscapes Alliance Journal volume 4, issue 1, pp. 40–59 (2026) · Cite this article

Abstract

A living wall was built at the Maison Familiale Rurale de Ventavon, in the Durance valley, by the students themselves and over two seasons. Only micro-local materials were used: pebbles from the river, soil from the site and plants of the place. Chambers for reptiles, amphibians and hedgehogs were set into the structure as it rose. The report follows the work from the first trench to the sown meadow, and takes a first reading of how the ground recovered.

Keywords

  • living wall
  • dry-stone construction
  • biodiversity
  • school landscaping
  • self-construction

Living walls

The association Une pierre sur l’autre has set itself the task of studying historic drystone proliferations. As part of these activities, we participate in naturalist collection and recognition programmes, including arthropods and molluscs. In our studies, we pay great attention to the landscape and ecological dimensions of developments.

It is in this context that we install “living walls”, a concept developed by Louis Cagin. Our postulate is based on the synthesis of several observations and reflections resulting from a practice of restoration of historic agrarian developments. Indeed, since the Neolithic period, humans have developed agriculture and pastoralism by developing the land on which they live to produce their means of subsistence. Until the middle of the twentieth century and mechanisation, these developments were almost exclusively autonomous, that they were made up only of the geological materials of the land itself. This had the effect, despite human activities, of allowing ecological continuity for the entire endemic food chain of living beings by leaving them a living space. Because, although redeveloping the place, the indigenous dry-stone developments do not destroy the local biodiversity. Finally, they re-establish the variety of biotopes and habitats, both for plants, but also mosses and lichens or pioneer plants, and for animals, arthropods, reptiles, amphibians, small mammals, etc.

The “living walls” presented here was installed at the MFR in Ventavon and is a model of its kind. Installed in line with the native landscaping, it used only local materials for its installation, pebbles from the Durance, soil of the land, local plants. This choice is economic; no material budget was necessary. The practice of dry-stone is also an educational exercise that is easy to adapt to the school environment, which the association has been developing for teaching teams for several years.

The teaching teams worked here in concert with Louis Cagin, dry-stone waller, who followed the students from the design to the realization of the fittings so that the work was sustainable. All the classes of the school participated in the action with their dedicated teachers, from the sixth grade (10-11 years old) to the BEP (18-20 years old), as part of their timetable; sport, life and earth sciences or modules dedicated to landscaping for practical courses.

This exercise is presented to you here, in this ITLA Journal, in order to serve as a model for other educational experiments to be inspired by it.

Each class, or half-class, dedicated a day of its school schedule to the realization of the project. Thus followed the 3rd year of agricultural education, CAP Agricultural Landscape Gardener, Second Professional Baccalaureate, “Nature Garden Landscape Forest”, Second Bac pro. “Sales Consulting Technician” and the final year students of the Bac Pro in Landscaping. The classes are supervised by their referent teachers, Jérémi Baranowski and Élise Vachier.

Each day began with a short hour of theoretical introduction in the classroom, adapted to the level of the class and its objectives. This hour made it possible to address and establish the landscape and ecological notions of dry-stone developments and to identify, in the experience of each person, their own relationship to these structuring structures of the landscape. It continued with a quick explanation of the principles of dry-stone construction on site and then moved on to the exercise: the realization of the development itself.

Figure 1
Figure 1. Aerial view of the MFR de Ventavon within the intensively farmed open-field landscape of the Durance valley. Source: IGN, France.

Description of the layout and educational objectives

The MFR of Ventavon is in a particularly humanised area of the Durance valley, exploited in intensive agriculture on an open-field plot. (Figure 1) The idea is to reintroduce a space dedicated to endemic biodiversity, both plant and animal, within the school space and, in return, to raise awareness of environmental issues among students.

The place chosen for this is a very deteriorated and trampled embankment at the entrance to the school. The planned dry stone wall also aims to redevelop the access to the school site in a more aesthetic way. The materials used were chosen for their locality: pebbles from the Durance River, extracted from the riverbed by a company in the municipality, and organic and inert “waste”, from the MFR’s educational activities, cutting plants, wood, tiles and materials that have been landfilled or from dismantled educational exercises. Within the wall are installed many niches intended to accommodate amphibians, reptiles or small mammals. Above all, these installations add meaning for the students, since the wall itself is already a home for many species by its very structure. Around the development, an area of low human intervention has been demarcated.

The ultimate pedagogical goal remains linked to a double awareness, to give students the desire to physically carry out developments on the one hand, but also to link this technical choice to environmental and landscape issues. Ideally, these experiments can be the subject of field monitoring, from one year to the next, in order to identify changes and the reconquest of the area by micro-wildlife. As the programme presented here is not linked to scientific observations, this follow-up is done informally within the framework of the courses of the professors who wish to do so. Once completed, these places then become rich educational materials to get out of abstraction and concretely address many notions of the school curriculum in the field.

Assessment of renaturation

As a year passed between the two actions, an initial assessment of the renaturation of the site was made on the part carried out in 2022.

On the lower embankment, in a triangular organisation and over an area of 200 m², differentiated management areas of grassy areas led to unmowed meadows. These areas are delimited by alleys that are mowed regularly and allow you to cross the area. The lower embankment of the wall was sown with a mixture of flower meadow seeds composed of annual and perennial plants. The space has not been mowed in order to promote the regeneration of the soil and the colonisation of the wall by animal species.

The upper median was backfilled with topsoil to catch up with the level of the edge surrounding the buildings. This embankment was sown with the same “flower meadow” mixture. The shrubby state has been thinned: a forsythia has been removed so that the other plants can benefit from more light.

The ecological assessment of renaturation in one year is not yet obvious. Nevertheless, the dynamic induced by this development is very real, in fact the creation of the living wall is the first step in the overall requalification of this space. To measure the effects, an inventory and observation monitoring carried out as part of the MFR’s educational activities will be set up (Figures 2 and 3).

Figure 2
Figure 2. The embankment at the school entrance before the work, trampled and largely bare. Photo: Louis Cagin, 2022.
Figure 3
Figure 3. The same embankment one year later, the pebble wall in place and the sown meadow established. Photo: Louis Cagin, 2023.
Figure 4
Figure 4. Technical section of the living wall, with pebble facing, gravel drain and biodegradable geotextile. Drawing: Louis Cagin, 2022.
Figure 5
Figure 5. Agronomic section of the living wall, showing the exposure and moisture zones that

The Living Wall

Each student participated in the development by installing, individually or in pairs, part of the wall and floors that make it up. Everyone realised that, more than a construction gesture, it was the installation of an ecosystem that was at stake. Thanks to the creation of a space integrating many parameters in order to accommodate the richest and most diverse chain of living things possible. This objective did not overshadow the technical aspect and the learning of the gestures related to the dry-stone equipment. Especially since the material proposed, the pebble, is not the most obvious “stone” to build a dry-stone wall.

Figure 6
Figure 6. Annotated survey view of the embankment to be redeveloped, with the existing plum, tamarisk and olive noted on site. Photo: Jérémi Baranowski, 2022.
Figure 7
Figure 7. Annotated survey view of the sanded path running along the foot of the embankment. Photo: Jérémi Baranowski, 2022.

The layout was thus understood as a complex technical exercise that required global attention, not only to the wall, but also to all the elements related to the floor to integrate it into its environment (Figures 4 and 5). An exercise guided by technical imperatives that are simple to understand but not always easy to implement.

The book installed during this week is part of a longer-term perspective for the MFR’s teaching team. It will be the subject of new activities by these same classes: • In the classroom, as a support or reference for the subjects studied in the programme, such as SVT or mathematics. • On site, it will continue to evolve with the planting of plants and maintenance or observation activities. • Naturalist monitoring of inventory and observations carried out as part of the MFR’s educational activities

Attention to the living

The initial embankment proved to be very biologically poor. This may be partly due to the time of intervention (late autumn), but it is also certainly linked to a very degraded local environment at the junction of the expanding peri-urban space and the intensive agricultural farming planted with apple monoculture.

A photo survey of the rare species encountered was made during the worksite. We continue the reconnaissance work in the room (Figures 8–13). Observations will be continued in the following years and during actions on the site to document the evolution of biological activity and any species that have colonised the space.

At the same time, samples of plants growing on the site were collected for the creation of a herbarium. In the same way, it will be the subject of exploitation and monitoring work by the students.

The construction of the wall in 2022 Layout and foundations

The linear length of the future wall face is designed by planting chestnut stakes to stretch the lines. These stakes will be integrated into the structure and will remain in place. A foundation trench is dug with a dip intended to let the water flow down the line. On this base of form is then spread a layer of rolled pebbles which will ensure the drainage of the lower part of the development. The foundation stones are laid directly on this drain.

Construction and installation of nesting boxes

Various nesting boxes were installed at the foundations. We opted for three devices: reptiles (Figures 17–19), amphibians and hedgehogs (Figures 20–23) .

We then integrated various devices at different levels of the equipment. We have played on exposure or protection to different factors; linked as much to the weather conditions (rain, sun, etc.) as to the materials used, mineral or organic. The installation of these niches is directly integrated into the construction of the wall. This allows each student to practice laying the pebbles by matching them as best as possible to obtain a durable structure. The wall thus rises to the desired height, while part of the workforce works on the supply of materials. Any excuse is good to generate diversity. Tiles protect the stakes and install dry areas where some animals will find the right living conditions or laying eggs.

Figure 8
Figure 8. A single land snail shell recovered from the embankment during the worksite. Photo: Louis Cagin, 2022.
Figure 9
Figure 9. A ground-dwelling spider, most likely a wolf spider (Lycosidae), on dry bare soil. Photo: Louis Cagin, 2022.
Figure 10
Figure 10. A pale grub, probably a scarab beetle larva (Scarabaeidae), curled in a cavity in the reddish soil. Photo: Louis Cagin, 2022.
Figure 11
Figure 11. An earthworm exposed in the loosened topsoil between tufts of grass. Photo: Louis Cagin, 2022.
Figure 12
Figure 12. An earthworm held against a photographic scale bar during sampling. Photo: Louis Cagin, 2022.
Figure 13
Figure 13. Small snail shells and shell fragments recovered from a soil sample and laid out for sorting. Photo: Louis Cagin, 2022.
Figure 14
Figure 14. A student stretching the line between chestnut stakes to set out the face of the wall. Photo: Louis Cagin, 2022.
Figure 15
Figure 15. The foundation trench dug along the line, with the dip that lets water drain away. Photo: Louis Cagin, 2022.Installing the foundation drain
Figure 16
Figure 16. Spreading the layer of rolled pebbles that forms the foundation drain. Photo: Louis Cagin, 2022.
Figure 17
Figure 17. Students setting the first stones of a reptile nest at the foot of the wall. Photo: Louis Cagin, 2022.
Figure 18
Figure 18. Closing the reptile nest with a tile roof before the wall is raised over it. Photo: Louis Cagin, 2022
Figure 19
Figure 19. Cross-section of the reptile device, with entrance, sand bed and foundation drain. Drawing: Louis Cagin, 2022.
Figure 20
Figure 20. Setting the stones of the hedgehog chamber into the excavated foundation. Photo: Louis Cagin, 2022.
Figure 21
Figure 21. A student laying the flat stone that closes the roof of the hedgehog chamber. Photo: Élise Vachier, 2022.
Figure 22
Figure 22. The completed hedgehog nest, packed with straw and closed by a large pebble. Photo: Louis Cagin, 2022.
Figure 23
Figure 23. Cross-section of the hedgehog nesting box, with its straw bed over a layer of sand. Drawing: Louis Cagin, 2022.
Figure 24
Figure 24. A student fitting pebbles into the face of the wall, matching each stone to its bed. Photo: Louis Cagin, 2022.
Figure 25
Figure 25. Levelling a course with a batten to keep the wall face true as it rises. Photo: Louis Cagin, 2022.
Figure 26
Figure 26. The wall in progress, with the organic device and the hedgehog nest marked in red. Photo: Louis Cagin, 2022.
Figure 27
Figure 27. Stones and a tile capping a stake, creating the dry pockets used by insects and reptiles. Photo: Louis Cagin, 2022.
Figure 28
Figure 28. Students in front of the section of wall built during their day on site. Photo: Louis Cagin, 2022.
Figure 29
Figure 29. Wider view of the same moment, with the completed lower course running across the slope. Photo: Louis Cagin, 2022.
Figure 30
Figure 30. The wall and its rear drain, with tiles left in place as shelters, before re-earthing. Photo: Louis Cagin, 2022.

Installing the soil

Even though the cavernous structure of the wall is a shelter and living space for many species of plants and animals, it is not a wall alone that makes biodiversity. Attention to the ground will take precedence and truly induce the dynamism of the ecosystem put in place.

Its installation follows a double imperative, like traditional and historic dry stone agricultural developments. On the one hand, technical, because it installs an interface to protect the equipment with the future rhizosphere, and on the other hand, agronomic, because it is intended to obtain a rich and dynamic soil, a guarantee of plant production. This attention to the ground begins with the first blows of the pickaxes intended to install the base in the initial embankment and to level the desired spaces.

Each clod is carefully recovered with its rhizosphere and reserved for re-earthing. Once this horizon is reserved, the deeper soils are also set aside to form the future embankment (Figure 31). The layers thus cleared will be put back in order during the re-earthing, which allows vegetation to resume as quickly as possible and in the best conditions. The embankment is thus reinstalled at the top of the wall once it is completed (Figure 34).

Figure 31
Figure 31. Compost, cuttings and grassy clods staged behind the finished wall, ready for re-earthing. Photo: Louis Cagin, 2022.
Figure 32
Figure 32. The organisation of the site around the construction of the ground, with the zones to be sloped, levelled and left unterraced. Photo: Louis Cagin, 2022.
Figure 33
Figure 33. Cuttings collected in a wheelbarrow for the vegetal layer behind the wall. Photo: Louis Cagin, 2022.
Figure 34
Figure 34. Annotated view of the installed embankment, reading as a section through the layers: the wall, the drain behind it, the clods and the sloped zone above the initial talus. Photo: Louis Cagin,
Figure 35
Figure 35. The re-earthed embankment above the wall, with the crown drain and the vegetal interface between wall and soil. Photo: Louis Cagin, 2022.
Figure 36
Figure 36. The completed wall seen along the access path, before the meadow was sown. Photo: Louis Cagin, 2022.
Figure 37
Figure 37. The renatured area in front of the school buildings after the 2022 worksite. Photo: Louis Cagin, 2022.
Figure 38
Figure 38. Detail of the pebble facing, with the clods laid along the top of the wall. Photo: Louis Cagin, 2022.

The final result The construction of the wall in 2023

The action was renewed in 2023. A new section of wall was installed a little further on the embankment, still facing south (Figure 39). The process of construction and installation, of both walls and the nesting boxes and various ecological spaces within the entire layout has been reproduced.

Figure 39
Figure 39. Elevation of the finished wall, with the reptile, amphibian and hedgehog niches marked. Photo: Louis Cagin, 2022.
Figure 40
Figure 40. View of the completed layout at the entrance to the school. Photo: Louis Cagin, 2023.
Figure 41
Figure 41. Setting out the structure of the 2023 wall with stakes and line. Photo: Louis Cagin, 2023.
Figure 42
Figure 42. Preparing the form base of the new foundation trench. Photo: Louis Cagin, 2023.
Figure 43
Figure 43. Installing a nesting box on the bed of rolled pebbles. Photo: Louis Cagin, 2023.
Figure 44
Figure 44. Planting into the crown of the wall once the drain is in place. Photo: Anthony Malo, 2023
Figure 45
Figure 45. Setting the grassy clods along the crown drain. Photo: Anthony Malo, 2023.

This time, there was not enough space to install a renaturation area as large as the one set up in 2022. The wall and embankment only allowed for a continuation and expansion of the system installed in 2022 (Figure 39). If you are interested in this experience, you can learn more about the subject by accessing the full report via the link https://unepierresurlautre.org/2023/12/09/un-mur-vivant/.

Figure 46
Figure 46. Students building the 2023 wall and laying out the ground behind it. Photo: Louis Cagin, 2023.
Figure 47
Figure 47. The 2023 wall extending the earlier layout towards the entrance. Photo: Louis Cagin, 2023.

A clip was produced with the students on this project. Text, music and interpretation are by Sange Demaud: https://unepierresurlautre.org/2023/12/24/le-slam-du-murailleur/

About the authors

  1. 1 Association 'Une pierre sur l'autre', France

Louis Cagin (France)

He is a dry stone waller, author and instructor, favours a landscape-based approach to terrace design, guided by an understanding of the local terroir and soils in their vernacular and historical specificity. This leads him to share techniques and knowledge, making it a practice accessible to everyone. While not denying the need for professional practice, he advocates for self-construction to empower everyone to take ownership of and maintain the landscape. He sees landscape as an interaction between people and place, based on design using only micro-local resources, without relying on external supplies. This approach, in effect, prioritises and protects the ecological continuity of the area.

Rights and permissions

Open Access. This article is licensed under a Creative Commons CC BY-SA 4.0 license, which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source and indicate if changes were made.

About this article

Cite this article

Cagin, L. (2026). Development of a living wall at the Maison Familiale Rurale de Ventavon Association 'Une pierre sur l'autre'. International Terraced Landscapes Alliance Journal, 4(1), 40–59. https://doi.org/10.5281/zenodo.23440567

Published
October 2026
Journal
International Terraced Landscapes Alliance Journal, ISSN 2754-7639 (Online)
  • living wall
  • dry-stone construction
  • biodiversity
  • school landscaping
  • self-construction

More from this issue

All articles →
EditorialOpen Access

Terrace Pedagogy

Maruja SALAS and Sevina FLORIDOU

Terraced landscapes and humans share a history of intimate reciprocity as living beings on earth. Mountains world-wide embody the structural matrix that model human perceptions developing attuned, diverse earth stewardships of landscapes along the five…

October 2026
ReportOpen Access

First use of a mobile stone workshop in the Lahn valley (Germany)

Frank BÖWINGLOH, Heiner BRODT and Walter OEFFLING

A mobile stone workshop was set up for the first time at the vineyard festival in Obernhof on the Lahn, on 6 and 7 June 2026, as part of the Lost Vine Place Lahn project. Using type boxes and templates, children and adults built small retaining walls without…

October 2026 · 2 views · 0 downloadsDOI10.5281/zenodo.23440559

Report an error

Did you find a mistake on this page, a broken link or a wrong name? Tell us what is wrong and leave your e-mail. The address of this page is added automatically.

ITLA application form

Please register as a member to receive information about ITLA activities and upcoming conferences, and to express interest in the Vth World Conference in Bhutan. Registration helps us identify potential active members and does not involve any financial commitment.

Sex (optional)
Global ITLA Committee (optional)

Your answers are stored in the ITLA registration form (Google Forms) and are used only to contact you about ITLA activities.